Skip to content
MHS CONSULTING
  • Home
  • About us
  • Services
  • Projects
  • Contact
  • Weglot switcher
Menu Close
  • Home
  • About us
  • Services
  • Projects
  • Contact
  • Weglot switcher

Reconstruction of a Ship Loader

You are currently viewing Reconstruction of a Ship Loader

Reconstruction of a Ship Loader

  • Post author:admin
  • Post category:CHILE
  • Post comments:0 Comments

Reconstruction and Commissioning of Shiploader at Patache Port after failure Iquique, Chile

You Might Also Like

Read more about the article 1700hp Drive station

1700hp Drive station

August 21, 2019
Read more about the article Commissionning of Stacker

Commissionning of Stacker

August 22, 2019
Read more about the article Overland Conveyor

Overland Conveyor

August 21, 2019

Leave a Reply Cancel reply

You must be logged in to post a comment.

Last Projects

  • Flash floods in Texas: at least 24 dead and 20 girls missing
  • 📢 Update news – b824beda
  • This Startup Built A Hospital In India To Test Its AI Software
  • Testing Aviator Game Performance on Weak 3G Networks: A Singaporean Player’s Review
  • Review: Optimal Devices to Run Brawl Pirates by 1win for Players from Multi
  • Inside the Latest Tiranga Updates for Colour Trading Enthusiasts

PROJECTS BY COUNTRY

  • CHILE
  • COLOMBIA
  • MEXICO
  • THAILAND
  • Uncategorized
  • USA

Gallery

Hans-Georg Dawidowski

  • General Manager and Owner
  • Phone:+1 (720) 217 2617Opens in your application
  • Email:gdawidowski@mhs-consulting.netOpens in your application
  • Whatsapp+1(720) 217 2617
  • Skype CallOpens in your application

Emma Imelda Forero Gil

  • Engineering Manager and CEO
  • Phone:+49 15736500672 Opens in your application
  • Email:eforero@mhs-consulting.netOpens in your application
  • Whatsapp+49 15736500672
  • Skype CallOpens in your application

CONTACT FORM

Please fill the contact form below, and we will contact you as soon as possible

    Copyright 2019 - MHS Consulting inc.

    Developed by Chibcha Digital